NAVY HISTORY - Ships - Frigate

HMCS SPRINGHILL


Placeholder image

The Canadian West Coast became a ship building powerhouse during the Second World War for both Naval and merchant ships. Additional information regarding the construction, record and ultimate fate of these ships will be added to these pages as this project progresses with current information available through the links listed below.

Placeholder image    Ship Information    Placeholder image
HMCS SPRINGHILL

Builder: Yarrows Ltd., Esquimalt, British Columbia, Canada

Construction Started: 5 May 1943

Launched: 7 September 1943

Commissioned :21 March 1944

Pennant #: K323

Gulf of St. Lawrence 1944

Decommissioned :1 December 1945

sold, scrapped 1947

Other Ships

Specifications
HMCS SPRINGHILL

Displacement: 1,445 long tons (1,468 t; 1,618 short tons) 2,110 long tons (2,140 t; 2,360 short tons) (deep load)

Length:283 ft (86.26 m) p/p 301.25 ft (91.82 m)o/a

Beam: 36.5 ft (11.13 m)

Draught: 9 ft (2.74 m); 13 ft (3.96 m) (deep load)

Propulsion: 2 x Admiralty 3-drum boilers, 2 shafts, reciprocating vertical triple expansion, 5,500 ihp (4,100 kW)

Speed: 20 knots (37.0 km/h) 20.5 knots (38.0 km/h) (turbine ships)

Compliment: 157

Armarments:
2 × QF 4 in (102 mm) /45 Mk. XVI on twin mount HA/LA Mk.XIX
1 × QF 12 pdr (3 in (76 mm)) 12 cwt /40 Mk. V on mounting HA/LA Mk.IX (not all ships)
8 × 20 mm QF Oerlikon A/A on twin mounts Mk.V
1 × Hedgehog 24 spigot A/S projector up to 150 depth charges

Other Mine Sweepers
Sources

Cite Article : Reference: www.navyhistory/sections/Ships/Minesweepers/HMCS_Courtenay.html

Source: NA